New Lock 8 showing the height which Lock 8 will need to reach
New Lock 8
A new deep lock is required near the end of the Aqueduct to allow boats to rise from the existing canal channel to connect with the Aqueduct. A rise of about 5 metres is required. To avoid loss of water it will be back-filled by electric pump.
The proposed locks are likely to be constructed to a traditional form, but in more modern materials, such as reinforced concrete and sheet piling
Photo:
| Access: | Private property - no access |
| Alignment: | On canal line |
| Huddlesford: | 6.20 Miles (10.00 Kms.) |
| Catshill: | 2.40 Miles (3.90 Kms.) |
52.65535, -1.90079