The main renovation worksites for the last couple of months have been at
Tamworth Road.
Firstly, concreting the basin floor at Pound 25 but also making
some progress with the new canal narrows - as it emerges from the redundant
lock 24, on the approach to Cricket Lane.
Pound 25
The work in Pound 25 has been digging out the old backfill material down to a
stable base below canal depth and then to import stable material up to concrete
depth and compact it. A visqueen membrane is then laid with rebar mesh above
before concreting takes place. The imported material is actually the
sand/sandstone which has been excavated from the new and deeper section of
canal narrows further up. This means that we can use some of the spoil material
that we are digging out (see section below) and don’t have to purchase
it.
Concreting has been hampered by either rain in May, giving way to higher high temperatures more recently in June. We have however made good progress and only have the last few sections of basin floor to do now before we reach the old invert level - the old lower gate of former lock 24.
Tamworth Road Narrows
The North wall has reached an inspection chamber for the ‘big pipe’ and so
hasn’t progressed any further in the last two months. However, Bill has finished
off the top two courses of the former lock chamber on the old lock north wall and
so we can start to fully complete sections of wall and move steadily westwards
towards Cricket Lane.
The work here over the last two months has mainly been taking place on the South wall. We had students from South Staffordshire College attend one Tuesday in late May and do some bricklaying for us. As well as progressing with the wall though we needed to start reducing the level of the path that we installed after it crosses the old bywash. A lot of material has to be stripped in order to reduce the level for the new canal depth. Eventually both towpath and the current path will merge.
The good thing has been that once we strip the top surface of soil we initially reach sand and then a much harder sandstone and this is the material that we use as part of the sub-base for the basin floor in pound 25. We are having to resort to using the claw attachment to dig out the final 300mm or so.
Roger has also been progressing with the blue brick soldier courses in order that we can complete further sections of the south wall.